A late change to the roof specification meant DB Industrial Roofing had to rethink the waterproofing for the plant deck at a new Marks & Spencer superstore in Sydenham, South East London. The original mineral felt covering was replaced with a WestWood liquid-applied system.
The client changed the specified covering from mineral felt to liquid-applied waterproofing at a late stage of the project. The revised approach required a quick design and procurement turnaround so the roof works could continue without affecting the programme.
The team installed WestWood Wecryl 230 Thix with associated WestWood primer and reinforcement products.
The plant deck included numerous supports, service penetrations and other detailed junctions. The liquid-applied system allowed the waterproofing to be formed around these areas without the same limitations as a sheet covering.
The revised waterproofing works were completed while maintaining the project programme.
For enquiries about commercial roofing and cladding projects: info@dbindustrialroofing.co.uk